FM studies show that flooding costs companies an average of US$2-$3 billion in losses annually worldwide—making it the most costly natural hazard globally. In any given year, extreme events such as Hurricane Katrina in 2005 and the Australia flooding in 2011 can cause high insured loss. FM has recorded more than 2,400 losses due to flooding in the past decade.
Ongoing analysis shows that a site within a published flood zone is five to seven times more likely to suffer a flood loss than to suffer an equivalent loss due to fire or explosion. In addition, the average flood loss is about one and a half times as great as the average fire loss.
For facilities in the planning stages, the simple solution is to locate the facility outside of the high and moderate hazard flood zone and levee/floodwall failure inundation areas, and design the site to ensure all storm-water drainage systems are adequate. For the approximately one in 10 industrial facilities already located within a flood zone, the solution isn’t quite as simple.
Facilities at risk for flooding must prepare well in advance in order to keep water out of critical buildings and limit resulting damage if floodwater enters a structure. FM loss history studies show that well-prepared organizations—including those with a tested flood emergency response plan (FERP)—have significantly less damage and resume operations sooner than those unprepared.
Among the physical preparations that firms can take to reduce the impact of flood events include permanent protection for electrical, computer and telecommunications equipment; backflow preventers and sump pumps for drains and sewers; relocation of high value stock and equipment; and permanent or temporary barriers to protect buildings against flood waters.
Flood mitigation products and systems include:
FM Approvals currently provides testing and certification for two types of flood mitigation equipment: perimeter barriers and opening barriers. These products and systems are evaluated in accordance with Approval Standard 2510, Approval Standard for Flood mitigation Equipment. Approval Standard 2510 testing consists of two main phases:
Due to the unique nature and variety of flood mitigation equipment, FM Approvals will prepare a customized evaluation program for each specific product. While customization of the component testing is necessary, performance testing is generic for all barrier systems.
FM Approvals is the only testing organization in the world that tests individual components and materials associated with flood mitigation products and systems, as well subjecting products to full-scale simulated riverine flood tests. For manufacturers of flood mitigation products and systems, the FM Approvals certification mark signifies to the marketplace the FM Approved product will meet or exceed expectations in critical flood control situations. All FM Approved flood mitigation products are listed in the online Approval Guide, increasing their visibility among the thousands of designers, architects, building owners, and engineers who specify FM Approved products for their projects.
A pharmaceutical firm experienced flash flooding, resulting in millions in damages and two months of business interruption. While bad, these losses could have been much worse if this firm did not have a flood emergency response plan (FERP). The firm’s emergency response team moved finished products to a higher level upon learning of the impending flood and sand bagged openings. In order to be better prepared, the firm is investing in permanent flood barriers for building openings.
Conformance to the following standards verifies that flood mitigation products meet the stated safety and performance criteria, providing assurance in their ability to protect during critical flood control situations.
ANSI FM 2510
American National Standard for Flood Mitigation Equipment
FM 2510
Flood Mitigation Equipment